top of page
gravel-extraction-plant-2025-01-08-06-20-32-utc_edited.jpg

Project Experience

crushed-stone-quarry-2025-01-09-01-07-54-utc.jpg

We Have 30 Years of Experience

Website Graphics.png

850+ Completed Projects

Project Experience

Project Listing 01a.png
Project Listing 02a.png
Project Listing 03a.png

We also offer Turnkey Engineering Solutions

Slag Recovery Plant Relocation - Poland to Finland 
Location: Finland

Services: Structural Analysis and Foundation Design, Layout and Conveyor Modification, Project Coordination with Fabricators and Contractors

Description: KTC relocated a slag recovery plant from Poland to Finland in 2021.
The project was challenging because the natural conditions in Finland and Poland are diametrically different. The project was built on the border of the Arctic Circle, which placed increased demands especially on steel structures. The objective of the project was to move the existing plant (supplied from Poland) to increase mining efficiency
by re-engineering the overall layout and adding in new equipment. 
010.png
3D model rendering of Material Screening and Crushing System-isometric view
011.png
3D model rendering of Material Screening and Crushing System-plan view
012.png
3D model rendering of belt conveyor feeding into screening system and its support structural steel 
013.png

3D model rendering of belt conveyor feeding vertical hog system and its support structural steel 

015.png
3D model rendering of Jig Plant Material Processing System-isometric view
016.png
3D model rendering of Jig Plant Material Processing System-plan view
017.png
3D model rendering of belt conveyor feeding from outside into a screen that is inside the building at the beginning of the process
018.png
Image-3D model rendering of a tank and its structural steel inside the building
Wood Chips Material Storage System
Location: Bulgaria

Services: Design of steel structures, statics and workshop documentation of 120t steel structures

 
Year 2019 Bulgaria-01.png
3D model rendering of Wood Chips Material Storage System
Year 2019 Bulgaria-02.jpg
3D model rendering of Wood Chips Material Storage System
Coal Conveyor Material Handling System Upgrade
Location: Slovakia

Services: Study of adding wood chips 30t/h to coal conveyor belts
Year 2013  Slovakia .jpg
3D model rendering of Coal Material Handling System
aerial-top-view-of-open-pit-development-and-sand-e-2025-02-10-16-30-09-utc (1).jpg

GET IN TOUCH

WE LOOK FORWARD TO HEARING FROM YOU

ADDRESS
B. Němcové 767/13, 787 01 Šumperk 1, Czechia

PHONE
420-583-217-891

KTC_Logo_PMS.png

Copyright KTC EuroProject.
All Rights Reserved.

bottom of page